Interactive Guide
Lifecycle phases
Development and project management
1 Development and project management
1.1 Development and consenting services
1.2 Environmental surveys
1.3 Resource and metocean assessment
1.4 Geological and hydrological surveys
1.5 Engineering and consultancy
1.6 Project management
Manufacturing
2 Manufacturing
2.1 Wind turbine
2.1.1 Turbine nacelle and hub
2.1.2 Turbine blades
2.1.3 Turbine tower
2.1.4 Turbine electrical system
2.2 Cables
2.2.1 Array cables
2.2.2 Export cables
2.3 Fixed foundation
2.4 Floating foundation
2.5 Mooring system (floating only)
2.6 Offshore substation
2.7 Onshore substation
Installation
3 Installation
3.1 Offshore substation
3.2 Offshore cables
3.3 Onshore export cables
3.4 Mooring system (floating only)
3.5 Turbine and foundation installation
3.6 Inbound transport
3.7 Construction port
3.8 Offshore logistics
3.9 Onshore substation
Operations and maintenance
4 Operations and maintenance
4.1 Operations
4.2 Maintenanace
4.3 Major repair
4.4 Offshore vessels and logistics
4.5 OMS port
Decommissioning
Development process
Port facilities
Jobscape
Career diagnostic
Contact
1.6 Project management
1.5 Engineering and consultancy
1.1 Development and
consenting services
1.3 Resource and metocean
assessment
1.4 Geological and hydrological
surveys
1.2 Environmental surveys
Development & project management
Manufacturing
→
2.6 Export cables
2.5 Array cables
2.7a Monopile foundation
2.8 Mooring system
2.10 Onshore substation
2.7b Semi-submersible floating foundation
2.9 Offshore substation
2.4 Turbine electrical system
2.3 Turbine tower
2.2 Turbine blade
2.1 Turbine nacelle and hub
←
Development & project management
Manufacturing
Installation (Offshore)
→
3.1 Offshore substation
3.8 Offshore logistics
3.2 Offshore cables
3.5 Turbine and foundation installation (fixed)
3.5 Turbine and foundation installation (floating)
3.4 Mooring system
←
Manufacturing
Installation (offshore)
Installation (Onshore)
→
3.9 Onshore substation
3.3 Onshore export cables
3.7b Construction port (floating)
3.7a Construction port (fixed)
←
Installation (Offshore)
Installation (onshore)
Operation & maintenance (Offshore)
→
4.3 Major repair
4.2 Maintenance
4.4 Offshore vessels and logistics
←
Installation (Onshore)
Operation & maintenance (offshore)
Operation & maintenance (Onshore)
→
3.7b OMS port
4.1 Operations
←
Operation & maintenance (Offshore)
Operation & maintenance (onshore)
Decommissioning
→
5.1 Decommissioning
←
Operation & maintenance (Onshore)
Decommissioning
Interactive Guide
Lifecycle phases
3
Development and project management
3
1 Development and project management
1.1 Development and consenting services
1.2 Environmental surveys
1.3 Resource and metocean assessment
1.4 Geological and hydrological surveys
1.5 Engineering and consultancy
1.6 Project management
Manufacturing
3
2 Manufacturing
2.1 Wind turbine
2.1.1 Turbine nacelle and hub
2.1.2 Turbine blades
2.1.3 Turbine tower
2.1.4 Turbine electrical system
2.2 Cables
2.2.1 Array cables
2.2.2 Export cables
2.3 Fixed foundation
2.4 Floating foundation
2.5 Mooring system (floating only)
2.6 Offshore substation
2.7 Onshore substation
Installation
3
3 Installation
3.1 Offshore substation
3.2 Offshore cables
3.3 Onshore export cables
3.4 Mooring system (floating only)
3.5 Turbine and foundation installation
3.6 Inbound transport
3.7 Construction port
3.8 Offshore logistics
3.9 Onshore substation
Operations and maintenance
3
4 Operations and maintenance
4.1 Operations
4.2 Maintenanace
4.3 Major repair
4.4 Offshore vessels and logistics
4.5 OMS port
Decommissioning
Development process
Port facilities
Jobscape
Career diagnostic
Contact